Novarly ParcelRenewable sites

Renewable sitesLand west of Hawkspur Green (Hill Hall Solar)

Land west of Hawkspur Green (Hill Hall Solar)

Land west of Hawkspur Green (Hill Hall Solar) is operational in Uttlesford with a recorded capacity of 4.9 MW, and has been generating since 2016-12-09.

4.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-09
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Uttlesford
Authority
England

Planning and build timeline

Application submitted2015-03-05
Permission granted2016-04-14
13 months after submission
Operational2016-12-09
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Uttlesford’s record on solar

Uttlesford has decided 18 solar farms and approved 89%, taking a median of 3.2 months. See every solar farm decision in Uttlesford

Other built sites within 15 km

SiteMWDistance
Hyde Farm
Solar Photovoltaics · Operational
10.81.1 km
Spriggs Farm
Solar Photovoltaics · Operational
122.4 km
Terriers Farm
Solar Photovoltaics · Operational
442.7 km
Station Works AD
Anaerobic Digestion · Operational
15.5 km
Four Elms Solar Array
Solar Photovoltaics · Operational
0.176.3 km
Tooleys Farm
Solar Photovoltaics · Operational
5.38.7 km
Long Meadow Solar Farm
Solar Photovoltaics · Operational
199.5 km
Dunmow Solar Farm, Chelmsford Road - Solar Farm
Solar Photovoltaics · Under Construction
9.8911.3 km

How big is Land west of Hawkspur Green (Hill Hall Solar)?

Land west of Hawkspur Green (Hill Hall Solar) has a recorded installed capacity of 4.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land west of Hawkspur Green (Hill Hall Solar)?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land west of Hawkspur Green (Hill Hall Solar) approved and built?

The application was submitted on 2015-03-05. Permission was granted on 2016-04-14, 13 months later. The site became operational on 2016-12-09, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1292.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council