Renewable sites › Station Works AD
Station Works AD
Station Works AD is operational in Uttlesford with a recorded capacity of 1 MW, and has been generating since 2012-02-01.
Planning and build timeline
| Application submitted | 2010-09-13 |
| Permission granted | not recorded |
| Operational | 2012-02-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Terriers Farm Solar Photovoltaics · Operational | 44 | 3 km |
Spriggs Farm Solar Photovoltaics · Operational | 12 | 3.5 km |
Hyde Farm Solar Photovoltaics · Operational | 10.8 | 4.5 km |
Land west of Hawkspur Green (Hill Hall Solar) Solar Photovoltaics · Operational | 4.9 | 5.5 km |
Long Meadow Solar Farm Solar Photovoltaics · Operational | 19 | 7.2 km |
Ugley Landfill Gas · Operational | 1.1 | 7.8 km |
Stanstead Solar Project Solar Photovoltaics · Under Construction | 14.3 | 8 km |
Tooleys Farm Solar Photovoltaics · Operational | 5.3 | 8.4 km |
How big is Station Works AD?
Station Works AD has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Station Works AD?
REPD records the operator as Privilege Finance/ BioWatt. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Station Works AD approved and built?
The application was submitted on 2010-09-13. REPD does not record a grant date. The site became operational on 2012-02-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6538.