Spriggs Farm is operational in Uttlesford with a recorded capacity of 12 MW, and has been generating since 2013-06-30.
Planning and build timeline
| Application submitted | 2012-11-08 |
| Permission granted | 2013-01-17 2 months after submission |
| Operational | 2013-06-30 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Uttlesford’s record on solar
Uttlesford has decided 18 solar farms and approved 89%, taking a median of 3.2 months. See every solar farm decision in Uttlesford →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Terriers Farm Solar Photovoltaics · Operational | 44 | 0.5 km |
Hyde Farm Solar Photovoltaics · Operational | 10.8 | 1.8 km |
Land west of Hawkspur Green (Hill Hall Solar) Solar Photovoltaics · Operational | 4.9 | 2.4 km |
Station Works AD Anaerobic Digestion · Operational | 1 | 3.5 km |
Long Meadow Solar Farm Solar Photovoltaics · Operational | 19 | 7.3 km |
Four Elms Solar Array Solar Photovoltaics · Operational | 0.17 | 8.3 km |
Tooleys Farm Solar Photovoltaics · Operational | 5.3 | 9.3 km |
Ugley Landfill Gas · Operational | 1.1 | 11.1 km |
How big is Spriggs Farm?
Spriggs Farm has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Spriggs Farm?
REPD records the operator as Abic. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Spriggs Farm approved and built?
The application was submitted on 2012-11-08. Permission was granted on 2013-01-17, 2 months later. The site became operational on 2013-06-30, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1166.