Rookwood Way - Solar Farm

Rookwood Way - Solar Farm is operational in West Suffolk with a recorded capacity of 2.04 MW, and has been generating since 2024-05-01.

2.04 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-05-01
Solar Photovoltaics
Technology
Sanofi UK
West Suffolk
Authority
England

Planning and build timeline

Application submitted2023-02-03
Permission granted2023-06-29
5 months after submission
Operational2024-05-01
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Suffolk’s record on solar

West Suffolk has decided 29 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in West Suffolk

Other built sites within 15 km

SiteMWDistance
Broxted Solar Farm (Stradishall Airfield)
Solar Photovoltaics · Operational
31.68.3 km
Cutbush Farm, Belchamp St Paul - Solar Array
Solar Photovoltaics · Under Construction
49.9911.6 km
Claredown Farm
Battery · Operational
2011.7 km
Land west of Hawkspur Green (Hill Hall Solar)
Solar Photovoltaics · Operational
4.912.7 km
Long Meadow Solar Farm
Solar Photovoltaics · Operational
1912.9 km
Spriggs Farm
Solar Photovoltaics · Operational
1213 km
Wadlow Wind Farm
Wind Onshore · Operational
2613.1 km
Hyde Farm
Solar Photovoltaics · Operational
10.813.5 km

How big is Rookwood Way - Solar Farm?

Rookwood Way - Solar Farm has a recorded installed capacity of 2.04 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rookwood Way - Solar Farm?

REPD records the operator as Sanofi UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rookwood Way - Solar Farm approved and built?

The application was submitted on 2023-02-03. Permission was granted on 2023-06-29, 5 months later. The site became operational on 2024-05-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12682.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council