Novarly ParcelRenewable sites

Renewable sitesTerriers Farm

Terriers Farm

Terriers Farm is operational in Uttlesford with a recorded capacity of 44 MW, and has been generating since 2022-02-01.

44 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-02-01
Solar Photovoltaics
Technology
Low Carbon
Uttlesford
Authority
England

Planning and build timeline

Application submitted2019-07-31
Permission granted2020-01-09
5 months after submission
Operational2022-02-01
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Uttlesford’s record on solar

Uttlesford has decided 18 solar farms and approved 89%, taking a median of 3.2 months. See every solar farm decision in Uttlesford

Other built sites within 15 km

SiteMWDistance
Spriggs Farm
Solar Photovoltaics · Operational
120.5 km
Hyde Farm
Solar Photovoltaics · Operational
10.81.9 km
Land west of Hawkspur Green (Hill Hall Solar)
Solar Photovoltaics · Operational
4.92.7 km
Station Works AD
Anaerobic Digestion · Operational
13 km
Long Meadow Solar Farm
Solar Photovoltaics · Operational
197.4 km
Four Elms Solar Array
Solar Photovoltaics · Operational
0.178.3 km
Tooleys Farm
Solar Photovoltaics · Operational
5.38.9 km
Ugley
Landfill Gas · Operational
1.110.7 km

How big is Terriers Farm?

Terriers Farm has a recorded installed capacity of 44 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Terriers Farm?

REPD records the operator as Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Terriers Farm approved and built?

The application was submitted on 2019-07-31. Permission was granted on 2020-01-09, 5 months later. The site became operational on 2022-02-01, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6700.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council