Renewable sitesKirkcaldy W W T W, Nether Street- Solar Panels

Kirkcaldy W W T W, Nether Street- Solar Panels

Kirkcaldy W W T W, Nether Street- Solar Panels is an operational 0.65 MW solar farm in Fife, generating since 15 June 2023. Planning permission was granted on 10 June 2022, 2 months after submission. Operator of record: Scottish Water.

0.65 MW
Capacity
as recorded in REPD
Operational
Status
since 15 June 2023
Solar Photovoltaics
Technology
Scottish Water
Fife
Authority
Scotland

Planning and build timeline

Application submitted1 April 2022
Permission granted10 June 2022
2 months after submission
Operational15 June 2023
12 months after consent

Screening a site of your own?

RedlineUK · £39

Fife approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kirkcaldy W W T W, Nether Street- Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
53.2 km
Wind Onshore · Operational
6.43.9 km
Wind Onshore · Operational
1.55 km
Solar Photovoltaics · Operational
55 km
Wind Onshore · Operational
1.55.3 km
Wind Onshore · Operational
256.4 km
Wind Onshore · Operational
6.96.5 km
Wind Onshore · Operational
18.47.3 km

How big is Kirkcaldy W W T W, Nether Street- Solar Panels?

Kirkcaldy W W T W, Nether Street- Solar Panels has a recorded installed capacity of 0.65 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkcaldy W W T W, Nether Street- Solar Panels?

REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkcaldy W W T W, Nether Street- Solar Panels approved and built?

The application was submitted on 1 April 2022. Permission was granted on 10 June 2022, 2 months later. The site became operational on 15 June 2023, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11155.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode