Kirkcaldy W W T W, Nether Street- Solar Panels is operational in Fife with a recorded capacity of 0.65 MW, and has been generating since 2023-06-15.

0.65 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-06-15
Solar Photovoltaics
Technology
Scottish Water
Fife
Authority
Scotland

Planning and build timeline

Application submitted2022-04-01
Permission granted2022-06-10
2 months after submission
Operational2023-06-15
12 months after consent

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Middle Balbeggie
Solar Photovoltaics · Operational
53.2 km
Middle Balbeggie Wind Turbines
Wind Onshore · Operational
6.43.9 km
Noble Foods
Wind Onshore · Operational
1.55 km
West Strathore Solar Limited
Solar Photovoltaics · Operational
55 km
Skeddoway Farm Wind Turbine
Wind Onshore · Operational
1.55.3 km
Little Raith Farm
Wind Onshore · Operational
256.4 km
Clentrie Wind Farm (Gevens)
Wind Onshore · Operational
6.96.5 km
Earlseat
Wind Onshore · Operational
18.47.3 km

How big is Kirkcaldy W W T W, Nether Street- Solar Panels?

Kirkcaldy W W T W, Nether Street- Solar Panels has a recorded installed capacity of 0.65 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkcaldy W W T W, Nether Street- Solar Panels?

REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkcaldy W W T W, Nether Street- Solar Panels approved and built?

The application was submitted on 2022-04-01. Permission was granted on 2022-06-10, 2 months later. The site became operational on 2023-06-15, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11155.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council