Novarly ParcelRenewable sites

Renewable sitesLeyes Road - New SEN School

Leyes Road - New SEN School

Leyes Road - New SEN School is a 0.24 MW solar farm under construction in Newham. Planning permission was granted on 27 November 2023, 2 months after submission. Operator of record: REDS10 Limited.

0.24 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
REDS10 Limited
Newham
Authority
England

Planning and build timeline

Application submitted26 September 2023
Permission granted27 November 2023
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Newham approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Leyes Road - New SEN School’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newham’s record on solar

Newham has decided 12 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Newham

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
12.2 km
Wind Onshore · Operational
2.23.3 km
Sewage Sludge Digestion · Operational
5.83.3 km
Solar Photovoltaics · Operational
13.4 km
Solar Photovoltaics · Under Construction
0.223.5 km
Biomass (dedicated) · Operational
193.6 km
Biomass (dedicated) · Operational
83.9 km
Biomass (dedicated) · Operational
34.1 km

How big is Leyes Road - New SEN School?

Leyes Road - New SEN School has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Leyes Road - New SEN School?

REPD records the operator as REDS10 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Leyes Road - New SEN School approved and built?

The application was submitted on 26 September 2023. Permission was granted on 27 November 2023, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15049.