Renewable sites › Leyes Road - New SEN School
Leyes Road - New SEN School
Leyes Road - New SEN School is under construction in Newham with a recorded capacity of 0.24 MW.
Planning and build timeline
| Application submitted | 2023-09-26 |
| Permission granted | 2023-11-27 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Newham’s record on solar
Newham has decided 12 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Newham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Thameside DC Solar Photovoltaics · Operational | 1 | 2.2 km |
Beckton Sewage Treatment Works Wind Onshore · Operational | 2.2 | 3.3 km |
Beckton STW Enhanced Sludge Digestion Sewage Sludge Digestion · Operational | 5.8 | 3.3 km |
Bywaters� Materials Recovery Facility Solar Array Solar Photovoltaics · Operational | 1 | 3.4 km |
New England Industrial Estate Development Solar Photovoltaics · Under Construction | 0.22 | 3.5 km |
Beckton Gas Pressure Reduction Station Biomass (dedicated) · Operational | 19 | 3.6 km |
Beckton STW Biodiesel Power Plant Biomass (dedicated) · Operational | 8 | 3.9 km |
King's Yard Biomass (dedicated) · Operational | 3 | 4.1 km |
How big is Leyes Road - New SEN School?
Leyes Road - New SEN School has a recorded installed capacity of 0.24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Leyes Road - New SEN School?
REPD records the operator as REDS10 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Leyes Road - New SEN School approved and built?
The application was submitted on 2023-09-26. Permission was granted on 2023-11-27, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15049.
Novarly Parcel · official public data, read properly · parcel.novarly.com