Novarly ParcelRenewable sites

Renewable sitesBeckton Sewage Treatment Works

Beckton Sewage Treatment Works

Beckton Sewage Treatment Works is operational in Newham with a recorded capacity of 2.2 MW, and has been generating since 2014-11-12.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-11-12
Wind Onshore
Technology
Thames Water Utilities
Newham
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2014-11-12

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Beckton STW Enhanced Sludge Digestion
Sewage Sludge Digestion · Operational
5.80 km
New England Industrial Estate Development
Solar Photovoltaics · Under Construction
0.220.4 km
Beckton Gas Pressure Reduction Station
Biomass (dedicated) · Operational
191 km
Beckton STW Biodiesel Power Plant
Biomass (dedicated) · Operational
81.3 km
Twin Tumps Way - Solar Panels
Solar Photovoltaics · Operational
0.622.7 km
Leyes Road - New SEN School
Solar Photovoltaics · Under Construction
0.243.3 km
Dagenham Docks Biogas (Waste AD)
Anaerobic Digestion · Operational
1.43.9 km
East Dagenham Docks AD (AD)
Anaerobic Digestion · Operational
1.44 km

How big is Beckton Sewage Treatment Works?

Beckton Sewage Treatment Works has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beckton Sewage Treatment Works?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beckton Sewage Treatment Works approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-11-12.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4976.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council