Beckton Gas Pressure Reduction Station is operational in Newham with a recorded capacity of 19 MW, and has been generating since 2015-03-30.
Planning and build timeline
| Application submitted | 2010-01-15 |
| Permission granted | 2010-08-26 7 months after submission |
| Operational | 2015-03-30 55 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Beckton STW Biodiesel Power Plant Biomass (dedicated) · Operational | 8 | 0.3 km |
Beckton STW Enhanced Sludge Digestion Sewage Sludge Digestion · Operational | 5.8 | 1 km |
Beckton Sewage Treatment Works Wind Onshore · Operational | 2.2 | 1 km |
New England Industrial Estate Development Solar Photovoltaics · Under Construction | 0.22 | 1.4 km |
Twin Tumps Way - Solar Panels Solar Photovoltaics · Operational | 0.62 | 1.7 km |
Dagenham Docks Biogas (Waste AD) Anaerobic Digestion · Operational | 1.4 | 3.4 km |
East Dagenham Docks AD (AD) Anaerobic Digestion · Operational | 1.4 | 3.4 km |
Leyes Road - New SEN School Solar Photovoltaics · Under Construction | 0.24 | 3.6 km |
How big is Beckton Gas Pressure Reduction Station?
Beckton Gas Pressure Reduction Station has a recorded installed capacity of 19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Beckton Gas Pressure Reduction Station?
REPD records the operator as Icon, EEA Holdings & 2OC consortium. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Beckton Gas Pressure Reduction Station approved and built?
The application was submitted on 2010-01-15. Permission was granted on 2010-08-26, 7 months later. The site became operational on 2015-03-30, 55 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 143.