Renewable sitesBywaters� Materials Recovery Facility Solar Array

Bywaters� Materials Recovery Facility Solar Array

Bywaters� Materials Recovery Facility Solar Array is operational in Newham with a recorded capacity of 1 MW, and has been generating since 2017-01-24.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-01-24
Solar Photovoltaics
Technology
Bywaters
Newham
Authority
England

Planning and build timeline

Application submitted2015-10-19
Permission granted2015-12-18
2 months after submission
Operational2017-01-24
13 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newham’s record on solar

Newham has decided 12 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Newham

Other built sites within 15 km

SiteMWDistance
King's Yard
Biomass (dedicated) · Operational
31.5 km
Leyes Road - New SEN School
Solar Photovoltaics · Under Construction
0.243.4 km
Thameside DC
Solar Photovoltaics · Operational
14.1 km
SELCHP ERF
EfW Incineration · Operational
355 km
Holly Street - Solar PV Panels
Solar Photovoltaics · Operational
0.165 km
New England Industrial Estate Development
Solar Photovoltaics · Under Construction
0.226 km
Beckton Sewage Treatment Works
Wind Onshore · Operational
2.26 km
Beckton STW Enhanced Sludge Digestion
Sewage Sludge Digestion · Operational
5.86 km

How big is Bywaters� Materials Recovery Facility Solar Array?

Bywaters� Materials Recovery Facility Solar Array has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bywaters� Materials Recovery Facility Solar Array?

REPD records the operator as Bywaters. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bywaters� Materials Recovery Facility Solar Array approved and built?

The application was submitted on 2015-10-19. Permission was granted on 2015-12-18, 2 months later. The site became operational on 2017-01-24, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6320.