Renewable sites › Bywaters� Materials Recovery Facility Solar Array
Bywaters� Materials Recovery Facility Solar Array
Bywaters� Materials Recovery Facility Solar Array is operational in Newham with a recorded capacity of 1 MW, and has been generating since 2017-01-24.
Planning and build timeline
| Application submitted | 2015-10-19 |
| Permission granted | 2015-12-18 2 months after submission |
| Operational | 2017-01-24 13 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Newham’s record on solar
Newham has decided 12 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Newham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
King's Yard Biomass (dedicated) · Operational | 3 | 1.5 km |
Leyes Road - New SEN School Solar Photovoltaics · Under Construction | 0.24 | 3.4 km |
Thameside DC Solar Photovoltaics · Operational | 1 | 4.1 km |
SELCHP ERF EfW Incineration · Operational | 35 | 5 km |
Holly Street - Solar PV Panels Solar Photovoltaics · Operational | 0.16 | 5 km |
New England Industrial Estate Development Solar Photovoltaics · Under Construction | 0.22 | 6 km |
Beckton Sewage Treatment Works Wind Onshore · Operational | 2.2 | 6 km |
Beckton STW Enhanced Sludge Digestion Sewage Sludge Digestion · Operational | 5.8 | 6 km |
How big is Bywaters� Materials Recovery Facility Solar Array?
Bywaters� Materials Recovery Facility Solar Array has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bywaters� Materials Recovery Facility Solar Array?
REPD records the operator as Bywaters. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bywaters� Materials Recovery Facility Solar Array approved and built?
The application was submitted on 2015-10-19. Permission was granted on 2015-12-18, 2 months later. The site became operational on 2017-01-24, 13 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6320.