Bywaters� Materials Recovery Facility Solar Array is an operational 1 MW solar farm in Newham, generating since 24 January 2017. Planning permission was granted on 18 December 2015, 2 months after submission. Operator of record: Bywaters.
Planning and build timeline
| Application submitted | 19 October 2015 |
| Permission granted | 18 December 2015 2 months after submission |
| Operational | 24 January 2017 13 months after consent |
Screening a site of your own?
Newham approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bywaters� Materials Recovery Facility Solar Array’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Newham’s record on solar
Newham has decided 12 solar farms and approved 100%, taking a median of 2 months. See every solar farm decision in Newham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 3 | 1.5 km |
Solar Photovoltaics · Under Construction | 0.24 | 3.4 km |
Solar Photovoltaics · Operational | 1 | 4.1 km |
EfW Incineration · Operational | 35 | 5 km |
Solar Photovoltaics · Operational | 0.16 | 5 km |
Solar Photovoltaics · Under Construction | 0.22 | 6 km |
Wind Onshore · Operational | 2.2 | 6 km |
Sewage Sludge Digestion · Operational | 5.8 | 6 km |
How big is Bywaters� Materials Recovery Facility Solar Array?
Bywaters� Materials Recovery Facility Solar Array has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bywaters� Materials Recovery Facility Solar Array?
REPD records the operator as Bywaters. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bywaters� Materials Recovery Facility Solar Array approved and built?
The application was submitted on 19 October 2015. Permission was granted on 18 December 2015, 2 months later. The site became operational on 24 January 2017, 13 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6320.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode