Thameside DC

Thameside DC is operational in Greenwich with a recorded capacity of 1 MW, and has been generating since 2016-01-15.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-15
Solar Photovoltaics
Technology
Sainsburys Supermarkets Limited
Greenwich
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-01-15

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Greenwich’s record on solar

Greenwich has decided 13 solar farms and approved 54%, taking a median of 1.8 months. See every solar farm decision in Greenwich

Other built sites within 15 km

SiteMWDistance
Leyes Road - New SEN School
Solar Photovoltaics · Under Construction
0.242.2 km
Bywaters� Materials Recovery Facility Solar Array
Solar Photovoltaics · Operational
14.1 km
SELCHP ERF
EfW Incineration · Operational
355.1 km
Beckton Gas Pressure Reduction Station
Biomass (dedicated) · Operational
195.1 km
Beckton STW Enhanced Sludge Digestion
Sewage Sludge Digestion · Operational
5.85.2 km
Beckton Sewage Treatment Works
Wind Onshore · Operational
2.25.2 km
King's Yard
Biomass (dedicated) · Operational
35.3 km
Beckton STW Biodiesel Power Plant
Biomass (dedicated) · Operational
85.4 km

How big is Thameside DC?

Thameside DC has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Thameside DC?

REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Thameside DC approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-01-15.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5985.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council