Renewable sites › Thameside DC
Thameside DC
Thameside DC is operational in Greenwich with a recorded capacity of 1 MW, and has been generating since 2016-01-15.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-01-15 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Greenwich’s record on solar
Greenwich has decided 13 solar farms and approved 54%, taking a median of 1.8 months. See every solar farm decision in Greenwich →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Leyes Road - New SEN School Solar Photovoltaics · Under Construction | 0.24 | 2.2 km |
Bywaters� Materials Recovery Facility Solar Array Solar Photovoltaics · Operational | 1 | 4.1 km |
SELCHP ERF EfW Incineration · Operational | 35 | 5.1 km |
Beckton Gas Pressure Reduction Station Biomass (dedicated) · Operational | 19 | 5.1 km |
Beckton STW Enhanced Sludge Digestion Sewage Sludge Digestion · Operational | 5.8 | 5.2 km |
Beckton Sewage Treatment Works Wind Onshore · Operational | 2.2 | 5.2 km |
King's Yard Biomass (dedicated) · Operational | 3 | 5.3 km |
Beckton STW Biodiesel Power Plant Biomass (dedicated) · Operational | 8 | 5.4 km |
How big is Thameside DC?
Thameside DC has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Thameside DC?
REPD records the operator as Sainsburys Supermarkets Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Thameside DC approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-01-15.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5985.
Novarly Parcel · official public data, read properly · parcel.novarly.com