Beckton STW Enhanced Sludge Digestion

Beckton STW Enhanced Sludge Digestion is an operational 5.8 MW sewage sludge digestion plant in Newham, generating since 15 December 2014. Planning permission was granted on 11 January 2013, 4 months after submission. Operator of record: Thames Water Utilities.

5.8 MW
Capacity
as recorded in REPD
Operational
Status
since 15 December 2014
Sewage Sludge Digestion
Technology
Thames Water Utilities
Newham
Authority
England

Planning and build timeline

Application submitted10 September 2012
Permission granted11 January 2013
4 months after submission
Operational15 December 2014
23 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Newham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Beckton STW Enhanced Sludge Digestion’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.20 km
Solar Photovoltaics · Under Construction
0.220.4 km
Biomass (dedicated) · Operational
191 km
Biomass (dedicated) · Operational
81.3 km
Solar Photovoltaics · Operational
0.622.7 km
Solar Photovoltaics · Under Construction
0.243.3 km
Anaerobic Digestion · Operational
1.43.9 km
Anaerobic Digestion · Operational
1.44 km

How big is Beckton STW Enhanced Sludge Digestion?

Beckton STW Enhanced Sludge Digestion has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beckton STW Enhanced Sludge Digestion?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beckton STW Enhanced Sludge Digestion approved and built?

The application was submitted on 10 September 2012. Permission was granted on 11 January 2013, 4 months later. The site became operational on 15 December 2014, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6182.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode