Beckton STW Enhanced Sludge Digestion

Beckton STW Enhanced Sludge Digestion is operational in Newham with a recorded capacity of 5.8 MW, and has been generating since 2014-12-15.

5.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-12-15
Sewage Sludge Digestion
Technology
Thames Water Utilities
Newham
Authority
England

Planning and build timeline

Application submitted2012-09-10
Permission granted2013-01-11
4 months after submission
Operational2014-12-15
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Beckton Sewage Treatment Works
Wind Onshore · Operational
2.20 km
New England Industrial Estate Development
Solar Photovoltaics · Under Construction
0.220.4 km
Beckton Gas Pressure Reduction Station
Biomass (dedicated) · Operational
191 km
Beckton STW Biodiesel Power Plant
Biomass (dedicated) · Operational
81.3 km
Twin Tumps Way - Solar Panels
Solar Photovoltaics · Operational
0.622.7 km
Leyes Road - New SEN School
Solar Photovoltaics · Under Construction
0.243.3 km
Dagenham Docks Biogas (Waste AD)
Anaerobic Digestion · Operational
1.43.9 km
East Dagenham Docks AD (AD)
Anaerobic Digestion · Operational
1.44 km

How big is Beckton STW Enhanced Sludge Digestion?

Beckton STW Enhanced Sludge Digestion has a recorded installed capacity of 5.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beckton STW Enhanced Sludge Digestion?

REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beckton STW Enhanced Sludge Digestion approved and built?

The application was submitted on 2012-09-10. Permission was granted on 2013-01-11, 4 months later. The site became operational on 2014-12-15, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6182.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council