Renewable sites › Beckton STW Biodiesel Power Plant
Beckton STW Biodiesel Power Plant
Beckton STW Biodiesel Power Plant is operational in Newham with a recorded capacity of 8 MW, and has been generating since 2010-12-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2010-12-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Beckton Gas Pressure Reduction Station Biomass (dedicated) · Operational | 19 | 0.3 km |
Beckton STW Enhanced Sludge Digestion Sewage Sludge Digestion · Operational | 5.8 | 1.3 km |
Beckton Sewage Treatment Works Wind Onshore · Operational | 2.2 | 1.3 km |
Twin Tumps Way - Solar Panels Solar Photovoltaics · Operational | 0.62 | 1.5 km |
New England Industrial Estate Development Solar Photovoltaics · Under Construction | 0.22 | 1.6 km |
Dagenham Docks Biogas (Waste AD) Anaerobic Digestion · Operational | 1.4 | 3.1 km |
East Dagenham Docks AD (AD) Anaerobic Digestion · Operational | 1.4 | 3.1 km |
Crossness Sewage Works PV Solar Photovoltaics · Operational | 1.5 | 3.3 km |
How big is Beckton STW Biodiesel Power Plant?
Beckton STW Biodiesel Power Plant has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Beckton STW Biodiesel Power Plant?
REPD records the operator as Balfour Beatty. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Beckton STW Biodiesel Power Plant approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2010-12-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 24.
Novarly Parcel · official public data, read properly · parcel.novarly.com