New England Industrial Estate Development is under construction in Barking and Dagenham with a recorded capacity of 0.22 MW.
Planning and build timeline
| Application submitted | 2021-03-12 |
| Permission granted | 2021-09-06 6 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Barking and Dagenham’s record on solar
Barking and Dagenham has decided 10 solar farms and approved 100%, taking a median of 1.6 months. See every solar farm decision in Barking and Dagenham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Beckton STW Enhanced Sludge Digestion Sewage Sludge Digestion · Operational | 5.8 | 0.4 km |
Beckton Sewage Treatment Works Wind Onshore · Operational | 2.2 | 0.4 km |
Beckton Gas Pressure Reduction Station Biomass (dedicated) · Operational | 19 | 1.4 km |
Beckton STW Biodiesel Power Plant Biomass (dedicated) · Operational | 8 | 1.6 km |
Twin Tumps Way - Solar Panels Solar Photovoltaics · Operational | 0.62 | 3.1 km |
Leyes Road - New SEN School Solar Photovoltaics · Under Construction | 0.24 | 3.5 km |
Dagenham Docks Biogas (Waste AD) Anaerobic Digestion · Operational | 1.4 | 4 km |
East Dagenham Docks AD (AD) Anaerobic Digestion · Operational | 1.4 | 4.2 km |
How big is New England Industrial Estate Development?
New England Industrial Estate Development has a recorded installed capacity of 0.22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates New England Industrial Estate Development?
REPD records the operator as Valour Real Estate Partners Llp. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was New England Industrial Estate Development approved and built?
The application was submitted on 2021-03-12. Permission was granted on 2021-09-06, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13932.
Novarly Parcel · official public data, read properly · parcel.novarly.com