Novarly ParcelRenewable planning

Renewable planning SolarNewham

Solar planning in Newham

Newham has decided 12 solar farms and approved 100% of them, taking a median of 2 months to decide. Consented capacity: 3 MW. 4 applications still awaiting a decision.

100%
Approved
12 granted · 0 refused
2 mo
Median decision
UK 2.3 mo
3 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How Newham compares

Against the 298 UK authorities with 5+ solar decisions, Newham sits in the 77th percentile for approval rate (7 points above the England average) and the 58th percentile for speed.

Decisions by year

35Approved — 1 (2015)115Approved — 1 (2022)122Approved — 5 (2023)523Approved — 2 (2024)224Approved — 3 (2025)325
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (16)

SchemeMWStatusDecided
Sainsbury, Claps Gate Lane - Solar Panels
Sainsburys Supermarkets Limited · 26/00411/PREPV
0.4Application Submitted2026-02-20
Newham University Hospital, Glen Road - Solar Panels
Barts Health NHS Trust · 26/00055/PREPV
0.77Application Submitted2026-01-13
Plashet School - Solar Panels
Repowering London · 25/01034/FUL · 2.1 mo to decide
0.2Awaiting Construction2025-07-29
Segro Park Canning, Town Bidder Street, Unit 2 - Solar Panels
CBRE Limited (Head Office) · 25/01312/PREPV · 1.1 mo to decide
0.24Awaiting Construction2025-07-22
Roman Road Primary School, Roman Road - Solar Panels
Repowering London · 25/01049/FUL · 1.7 mo to decide
0.17Awaiting Construction2025-07-08
Ellen Wilkinson School, Tollgate Road - Solar PhotovoltaicPanels
Repowering London · 24/00168/FUL · 2.5 mo to decide
0.17Awaiting Construction2024-04-09
University Of East London, Stratford Cam PV Panels
University Of East London · 23/02658/PREPV · 2.2 mo to decide
0.17Awaiting Construction2024-03-18
University Of East London Dockland Campus, University Way - Soalr Panels
University Of East London · 23/02187/PREPV · 2.3 mo to decide
Awaiting Construction2023-12-19
Leyes Road - New SEN School
REDS10 Limited · 23/01875/REM · 2 mo to decide
0.24Under Construction2023-11-27
Knowledge Dock, University Way - Solar Panel
University of East London · 23/01611/PREPV · 1.8 mo to decide
0.15Awaiting Construction2023-09-12
Westfield Stratford City, Montfichet Road - Solar Panels
Unibail-Rodamco-Westfield� · 23/00271/PRPVNDB · 1.8 mo to decide
0.33Awaiting Construction2023-08-21
Atlantis Avenue, Beckton - Solar PV Systems
Lincolnshire County Council · 23/00695/PREPV · 1.8 mo to decide
0.36Awaiting Construction2023-06-20
University Of East London - 650 Student accommodation & Teaching and learning
University of East London · 23/00790/FUL
0.18Application Submitted2023-04-05
Newham Leisure Centre, Prince Regent Lane - Solar Panels
Repowering London · 22/02919/FUL
0.19Application Submitted2022-12-13
Newham Dockside - Photovoltaic Panels
London Borough of Newham · 22/00218/PREPV · 2.1 mo to decide
0.44Awaiting Construction2022-03-10
Bywaters� Materials Recovery Facility Solar Array
Bywaters · 15/02981/PREPV · 2 mo to decide
1Operational2015-12-18

Does Newham approve solar farms?

Yes — of the 12 solar farms Newham has decided, 100% were approved (12 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Newham?

The median time from application to decision is 2 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Newham consented?

3 MW has been consented across 12 approved schemes. A further 4 applications awaits a decision.

Other technologies in Newham

Battery storage in NewhamOnshore wind in Newham

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.