Renewable sites › J3 Business Park - Battery Energy Storage Facility
J3 Business Park - Battery Energy Storage Facility
J3 Business Park - Battery Energy Storage Facility is a 10 MW battery storage site under construction in Doncaster. Planning permission was granted on 24 January 2023, 3 months after submission. Operator of record: Forepower Limited.
Planning and build timeline
| Application submitted | 26 October 2022 |
| Permission granted | 24 January 2023 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Doncaster approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with J3 Business Park - Battery Energy Storage Facility’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Doncaster’s record on battery storage
Doncaster has decided 10 battery storage schemes and approved 100%, taking a median of 5.1 months. See every battery storage scheme decision in Doncaster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 3 | 3.8 km |
Anaerobic Digestion · Operational | 2 | 3.8 km |
Solar Photovoltaics · Operational | 2.5 | 7.4 km |
Solar Photovoltaics · Operational | 1.7 | 7.6 km |
Wind Onshore · Operational | 8 | 8.1 km |
EfW Incineration · Operational | 3 | 9.2 km |
Solar Photovoltaics · Under Construction | 2.5 | 9.3 km |
Solar Photovoltaics · Operational | 5 | 11.7 km |
How big is J3 Business Park - Battery Energy Storage Facility?
J3 Business Park - Battery Energy Storage Facility has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates J3 Business Park - Battery Energy Storage Facility?
REPD records the operator as Forepower Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was J3 Business Park - Battery Energy Storage Facility approved and built?
The application was submitted on 26 October 2022. Permission was granted on 24 January 2023, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12920.
Novarly Parcel · official public data, read properly · parcel.novarly.com