Novarly ParcelRenewable sites

Renewable sitesCroft Farm, Askern Road - Solar Array & Hydrogen Plant

Croft Farm, Askern Road - Solar Array & Hydrogen Plant

Croft Farm, Askern Road - Solar Array & Hydrogen Plant is a 2.5 MW solar farm under construction in Doncaster. Planning permission was granted on 11 May 2023, 8 months after submission. Operator of record: CF Estates (Yorkshire) Limited.

2.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
CF Estates (Yorkshire) Limited
Doncaster
Authority
England

Planning and build timeline

Application submitted13 September 2022
Permission granted11 May 2023
8 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Doncaster approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Croft Farm, Askern Road - Solar Array & Hydrogen Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Doncaster’s record on solar

Doncaster has decided 27 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Doncaster

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
2.14.1 km
Solar Photovoltaics · Operational
54.5 km
Wind Onshore · Operational
85.2 km
Anaerobic Digestion · Operational
25.6 km
Anaerobic Digestion · Operational
35.6 km
Solar Photovoltaics · Operational
2.46.6 km
Wind Onshore · Operational
86.8 km
Solar Photovoltaics · Under Construction
36.9 km

How big is Croft Farm, Askern Road - Solar Array & Hydrogen Plant?

Croft Farm, Askern Road - Solar Array & Hydrogen Plant has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Croft Farm, Askern Road - Solar Array & Hydrogen Plant?

REPD records the operator as CF Estates (Yorkshire) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Croft Farm, Askern Road - Solar Array & Hydrogen Plant approved and built?

The application was submitted on 13 September 2022. Permission was granted on 11 May 2023, 8 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12507.