Novarly ParcelRenewable sites

Renewable sitesIkea Distribution Centre

Ikea Distribution Centre

Ikea Distribution Centre is operational in Doncaster with a recorded capacity of 1.7 MW, and has been generating since 2015-12-23.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-23
Solar Photovoltaics
Technology
IKEA Properties Investments Ltd
Doncaster
Authority
England

Planning and build timeline

Application submitted2014-02-17
Permission granted2014-04-08
2 months after submission
Operational2015-12-23
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Doncaster’s record on solar

Doncaster has decided 27 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Doncaster

Other built sites within 15 km

SiteMWDistance
Next Distribution Centre Doncaster
Solar Photovoltaics · Operational
2.50.3 km
Trackwork Limited (EfW)
EfW Incineration · Operational
34.8 km
Bootham Lane
Landfill Gas · Operational
1.25.2 km
Bootham Lane Phase 2
Landfill Gas · Operational
1.45.2 km
Bootham Lane Landfill
Landfill Gas · Operational
2.75.7 km
Tudworth Field Road, Hatfield - Solar PV Panels
Solar Photovoltaics · Operational
0.276.8 km
Tudworth Field Road, Hatfield - Solar Panels
Solar Photovoltaics · Under Construction
0.186.8 km
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension
Anaerobic Digestion · Operational
37 km

How big is Ikea Distribution Centre?

Ikea Distribution Centre has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ikea Distribution Centre?

REPD records the operator as IKEA Properties Investments Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ikea Distribution Centre approved and built?

The application was submitted on 2014-02-17. Permission was granted on 2014-04-08, 2 months later. The site became operational on 2015-12-23, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1490.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council