Novarly ParcelRenewable sites

Renewable sitesIkea Distribution Centre

Ikea Distribution Centre

Ikea Distribution Centre is an operational 1.7 MW solar farm in Doncaster, generating since 23 December 2015. Planning permission was granted on 8 April 2014, 2 months after submission. Operator of record: IKEA Properties Investments Ltd.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 23 December 2015
Solar Photovoltaics
Technology
IKEA Properties Investments Ltd
Doncaster
Authority
England

Planning and build timeline

Application submitted17 February 2014
Permission granted8 April 2014
2 months after submission
Operational23 December 2015
20 months after consent

Screening a site of your own?

RedlineUK · £39

Doncaster approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ikea Distribution Centre’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Doncaster’s record on solar

Doncaster has decided 27 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Doncaster

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.50.3 km
EfW Incineration · Operational
34.8 km
Landfill Gas · Operational
1.45.2 km
Landfill Gas · Operational
1.25.2 km
Landfill Gas · Operational
2.75.7 km
Solar Photovoltaics · Operational
0.276.8 km
Solar Photovoltaics · Under Construction
0.186.8 km
Anaerobic Digestion · Operational
27 km

How big is Ikea Distribution Centre?

Ikea Distribution Centre has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ikea Distribution Centre?

REPD records the operator as IKEA Properties Investments Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ikea Distribution Centre approved and built?

The application was submitted on 17 February 2014. Permission was granted on 8 April 2014, 2 months later. The site became operational on 23 December 2015, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1490.

Novarly Parcel · official public data, read properly · parcel.novarly.com