Renewable sites › Next Distribution Centre Doncaster
Next Distribution Centre Doncaster
Next Distribution Centre Doncaster is operational in Doncaster with a recorded capacity of 2.5 MW, and has been generating since 2016-12-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-12-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Doncaster’s record on solar
Doncaster has decided 27 solar farms and approved 96%, taking a median of 2.3 months. See every solar farm decision in Doncaster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ikea Distribution Centre Solar Photovoltaics · Operational | 1.7 | 0.3 km |
Trackwork Limited (EfW) EfW Incineration · Operational | 3 | 5 km |
Bootham Lane Landfill Gas · Operational | 1.2 | 5.6 km |
Bootham Lane Phase 2 Landfill Gas · Operational | 1.4 | 5.6 km |
Bootham Lane Landfill Landfill Gas · Operational | 2.7 | 6 km |
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension Anaerobic Digestion · Operational | 3 | 6.9 km |
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) Anaerobic Digestion · Operational | 2 | 6.9 km |
Tudworth Field Road, Hatfield - Solar PV Panels Solar Photovoltaics · Operational | 0.27 | 7.1 km |
How big is Next Distribution Centre Doncaster?
Next Distribution Centre Doncaster has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Next Distribution Centre Doncaster?
REPD records the operator as Next/ Eneco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Next Distribution Centre Doncaster approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-12-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6403.