Renewable sites › Trackwork Limited (EfW)
Trackwork Limited (EfW)
Trackwork Limited (EfW) is operational in Doncaster with a recorded capacity of 3 MW, and has been generating since 2011-02-28.
Planning and build timeline
| Application submitted | 2004-10-12 |
| Permission granted | 2005-01-06 3 months after submission |
| Operational | 2011-02-28 74 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bootham Lane Landfill Gas · Operational | 1.2 | 3.9 km |
Bootham Lane Phase 2 Landfill Gas · Operational | 1.4 | 3.9 km |
Bootham Lane Landfill Landfill Gas · Operational | 2.7 | 4.2 km |
Ikea Distribution Centre Solar Photovoltaics · Operational | 1.7 | 4.8 km |
Next Distribution Centre Doncaster Solar Photovoltaics · Operational | 2.5 | 5 km |
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension Anaerobic Digestion · Operational | 3 | 6.5 km |
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) Anaerobic Digestion · Operational | 2 | 6.5 km |
Tudworth Field Road, Hatfield - Solar PV Panels Solar Photovoltaics · Operational | 0.27 | 7 km |
How big is Trackwork Limited (EfW)?
Trackwork Limited (EfW) has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Trackwork Limited (EfW)?
REPD records the operator as Trackwork. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Trackwork Limited (EfW) approved and built?
The application was submitted on 2004-10-12. Permission was granted on 2005-01-06, 3 months later. The site became operational on 2011-02-28, 74 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 857.