Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) is operational in Doncaster with a recorded capacity of 2 MW, and has been generating since 2011-09-09.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-09-09
Anaerobic Digestion
Technology
Prosper Demulder / ReFood
Doncaster
Authority
England

Planning and build timeline

Application submitted2008-08-27
Permission granted2009-02-17
6 months after submission
Operational2011-09-09
31 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension
Anaerobic Digestion · Operational
30 km
J3 Business Park - Battery Energy Storage Facility
Battery · Under Construction
103.8 km
Croft Farm, Askern Road - Solar Array & Hydrogen Plant
Solar Photovoltaics · Under Construction
2.55.6 km
Trackwork Limited (EfW)
EfW Incineration · Operational
36.5 km
Marr Windfarm
Wind Onshore · Operational
86.8 km
Next Distribution Centre Doncaster
Solar Photovoltaics · Operational
2.56.9 km
Ikea Distribution Centre
Solar Photovoltaics · Operational
1.77 km
Hampole Wind Farm
Wind Onshore · Operational
89 km

How big is Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)?

Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)?

REPD records the operator as Prosper Demulder / ReFood. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) approved and built?

The application was submitted on 2008-08-27. Permission was granted on 2009-02-17, 6 months later. The site became operational on 2011-09-09, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 242.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council