Renewable sites › Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) is an operational 2 MW anaerobic digestion plant in Doncaster, generating since 9 September 2011. Planning permission was granted on 17 February 2009, 6 months after submission. Operator of record: Prosper Demulder / ReFood.
Planning and build timeline
| Application submitted | 27 August 2008 |
| Permission granted | 17 February 2009 6 months after submission |
| Operational | 9 September 2011 31 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Doncaster: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 3 | 0 km |
Battery · Under Construction | 10 | 3.8 km |
Solar Photovoltaics · Under Construction | 2.5 | 5.6 km |
EfW Incineration · Operational | 3 | 6.5 km |
Wind Onshore · Operational | 8 | 6.8 km |
Solar Photovoltaics · Operational | 2.5 | 6.9 km |
Solar Photovoltaics · Operational | 1.7 | 7 km |
Wind Onshore · Operational | 8 | 9 km |
How big is Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)?
Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD)?
REPD records the operator as Prosper Demulder / ReFood. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) approved and built?
The application was submitted on 27 August 2008. Permission was granted on 17 February 2009, 6 months later. The site became operational on 9 September 2011, 31 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 242.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode