Renewable sitesProsper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension

Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension

Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension is an operational 3 MW anaerobic digestion plant in Doncaster, generating since 2 June 2015. Planning permission was granted on 20 November 2013, 3 months after submission. Operator of record: Prosper Demulder / ReFood.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2 June 2015
Anaerobic Digestion
Technology
Prosper Demulder / ReFood
Doncaster
Authority
England

Planning and build timeline

Application submitted30 August 2013
Permission granted20 November 2013
3 months after submission
Operational2 June 2015
18 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Doncaster: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
20 km
Battery · Under Construction
103.8 km
Solar Photovoltaics · Under Construction
2.55.6 km
EfW Incineration · Operational
36.5 km
Wind Onshore · Operational
86.8 km
Solar Photovoltaics · Operational
2.56.9 km
Solar Photovoltaics · Operational
1.77 km
Wind Onshore · Operational
89 km

How big is Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension?

Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension?

REPD records the operator as Prosper Demulder / ReFood. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Prosper Demulder Limited Anaerobic Digestion Plant (Waste AD) - extension approved and built?

The application was submitted on 30 August 2013. Permission was granted on 20 November 2013, 3 months later. The site became operational on 2 June 2015, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 307.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode