Novarly ParcelRenewable sites

Renewable sitesGreat Wheatley Road - Solar Farm

Great Wheatley Road - Solar Farm

Great Wheatley Road - Solar Farm is under construction in Rochford with a recorded capacity of 30 MW.

30 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Aura Power Solar UK Limited
Rochford
Authority
England

Planning and build timeline

Application submitted2022-03-17
Permission granted2024-03-11
24 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rochford’s record on solar

Rochford has decided 7 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Rochford

Other built sites within 15 km

SiteMWDistance
Dollymans Storage
Battery · Operational
99.982.7 km
London Southend Airport
Solar Photovoltaics · Operational
2.56.7 km
Tesco Extra Hazelmere
Solar Photovoltaics · Operational
0.46.9 km
Nevendon Battery Storage Extension
Battery · Operational
57.2 km
Nevendon
Battery · Operational
107.2 km
Pitsea Landfill Scheme
Landfill Gas · Operational
11.67.8 km
Pitsea Tipp
Landfill Gas · Operational
147.9 km
South Fambridge Hall - Solar farm & Battery storage
Solar Photovoltaics · Under Construction
49.998.1 km

How big is Great Wheatley Road - Solar Farm?

Great Wheatley Road - Solar Farm has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Great Wheatley Road - Solar Farm?

REPD records the operator as Aura Power Solar UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Great Wheatley Road - Solar Farm approved and built?

The application was submitted on 2022-03-17. Permission was granted on 2024-03-11, 24 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9802.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council