Solar planning in Rochford

Rochford has decided 7 solar farms and approved 100% of them, taking a median of 5.7 months to decide. Consented capacity: 143 MW. 3 applications still awaiting a decision.

100%
Approved
7 granted · 0 refused
5.7 mo
Median decision
UK 2.3 mo
143 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Rochford compares

Against the 298 UK authorities with 5+ solar decisions, Rochford sits in the 77th percentile for approval rate (7 points above the England average) and the 4th percentile for speed.

Decisions by year

35Approved — 3 (2015)315Approved — 1 (2021)121Approved — 3 (2024)324
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (10)

SchemeMWStatusDecided
Rochford Hospital, Union Lane - Solar PV Panels
Energy Efficient Solutions Group · 26/00085/PNSOL
0.32Application Submitted2026-02-03
Clements Hall Leisure Centre, Clements Hall Way - Solar Panels
Brentwood Borough Council · 24/00718/DPDP3 · 1.7 mo to decide
0.25Awaiting Construction2024-11-29
Great Wheatley Road - Solar Farm
Aura Power Solar UK Limited · 22/00175/FUL · 23.8 mo to decide
30Under Construction2024-03-11
Canewdon Road, Canewdon - Solar Photovoltaic Farm
Low Carbon UK Solar Investment Company Limited · 23/00407/FUL · 7.7 mo to decide
49.9Awaiting Construction2024-01-11
Bolt Hall Farm, Lark Hill Road - Solar Photovoltaic Farm.
Green Switch Capital Limited · 23/00733/FUL
49.95Application Submitted2023-08-23
South Fambridge Hall - Solar farm & Battery storage
British Solar Renewables / BayWa r.e. UK Limited · 21/00605/FUL · 5.8 mo to decide
49.99Under Construction2021-12-15
London Southend Airport
London Southend Airport Co. · 15/00190/FUL · 2.1 mo to decide
2.5Operational2015-05-29
Fambridge Road/Canewdon Road
UK Solar Assets (Alcor LS-SPV) · 14/00649/FUL · 5.7 mo to decide
5Operational2015-04-02
Fambridge Road/Canewdon Road
UK Solar Assets (Pobail LS-SPV) · 14/00649/FUL · 5.7 mo to decide
5Planning Permission Expired2015-04-02
London Southend Airport
London Southend Airport Ltd · 14/00779/FUL · 1.8 mo to decide
3Revised2014-12-22

Does Rochford approve solar farms?

Yes — of the 7 solar farms Rochford has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Rochford?

The median time from application to decision is 5.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Rochford consented?

143 MW has been consented across 7 approved schemes. A further 3 applications awaits a decision.

Other technologies in Rochford

Battery storage in RochfordOnshore wind in Rochford

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.