Novarly ParcelRenewable sites

Renewable sitesLondon Southend Airport

London Southend Airport

London Southend Airport is operational in Rochford with a recorded capacity of 2.5 MW, and has been generating since 2016-01-12.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-12
Solar Photovoltaics
Technology
London Southend Airport Co.
Rochford
Authority
England

Planning and build timeline

Application submitted2015-03-27
Permission granted2015-05-29
2 months after submission
Operational2016-01-12
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rochford’s record on solar

Rochford has decided 7 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Rochford

Other built sites within 15 km

SiteMWDistance
Fambridge Road/Canewdon Road
Solar Photovoltaics · Operational
55 km
South Fambridge Hall - Solar farm & Battery storage
Solar Photovoltaics · Under Construction
49.995.8 km
South Fambridge Hall - Solar farm & Battery storage
Battery · Under Construction
205.8 km
Great Wheatley Road - Solar Farm
Solar Photovoltaics · Under Construction
306.7 km
Barling Hall Farm
Landfill Gas · Operational
2.46.9 km
Dollymans Storage
Battery · Operational
99.989.2 km
Wick Farm (Burnham on Crouch)
Solar Photovoltaics · Operational
511.8 km
Tesco Extra Hazelmere
Solar Photovoltaics · Operational
0.413.4 km

How big is London Southend Airport?

London Southend Airport has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates London Southend Airport?

REPD records the operator as London Southend Airport Co.. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was London Southend Airport approved and built?

The application was submitted on 2015-03-27. Permission was granted on 2015-05-29, 2 months later. The site became operational on 2016-01-12, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5946.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council