Novarly ParcelRenewable sites

Renewable sitesSouth Fambridge Hall - Solar farm & Battery storage

South Fambridge Hall - Solar farm & Battery storage

South Fambridge Hall - Solar farm & Battery storage is under construction in Rochford with a recorded capacity of 49.99 MW.

49.99 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
British Solar Renewables / BayWa r.e. UK Limited
Rochford
Authority
England

Planning and build timeline

Application submitted2021-06-22
Permission granted2021-12-15
6 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rochford’s record on solar

Rochford has decided 7 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Rochford

Other built sites within 15 km

SiteMWDistance
South Fambridge Hall - Solar farm & Battery storage
Battery · Under Construction
200 km
Fambridge Road/Canewdon Road
Solar Photovoltaics · Operational
51 km
London Southend Airport
Solar Photovoltaics · Operational
2.55.8 km
Great Wheatley Road - Solar Farm
Solar Photovoltaics · Under Construction
308.1 km
Maldon Wycke Solar Farm
Solar Photovoltaics · Operational
258.8 km
Barling Hall Farm
Landfill Gas · Operational
2.48.9 km
Dollymans Storage
Battery · Operational
99.989.4 km
Wick Farm (Burnham on Crouch)
Solar Photovoltaics · Operational
510.7 km

How big is South Fambridge Hall - Solar farm & Battery storage?

South Fambridge Hall - Solar farm & Battery storage has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates South Fambridge Hall - Solar farm & Battery storage?

REPD records the operator as British Solar Renewables / BayWa r.e. UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was South Fambridge Hall - Solar farm & Battery storage approved and built?

The application was submitted on 2021-06-22. Permission was granted on 2021-12-15, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9273.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council