Novarly ParcelRenewable sites

Renewable sitesCobham Motorway Service Area - Solar Photovoltaics

Cobham Motorway Service Area - Solar Photovoltaics

Cobham Motorway Service Area - Solar Photovoltaics is operational in Elmbridge with a recorded capacity of 0.45 MW, and has been generating since 2025-10-01.

0.45 MW
Capacity
as recorded in REPD
Operational
Status
since 2025-10-01
Solar Photovoltaics
Technology
Extra MSA Cobham Limited
Elmbridge
Authority
England

Planning and build timeline

Application submitted2025-06-27
Permission granted2025-08-25
2 months after submission
Operational2025-10-01
1 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Elmbridge’s record on solar

Elmbridge has decided 8 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Elmbridge

Other built sites within 15 km

SiteMWDistance
Dorking Battery Energy Storage System
Battery · Operational
69 km
Albury Landfill
Landfill Gas · Operational
1.510.7 km
Hurst Road - Walton Solar PV Farm
Solar Photovoltaics · Operational
0.5510.9 km
Walton WTW PV
Solar Photovoltaics · Operational
1.811.1 km
Charlton Lane Eco Park (Waste AD)
Anaerobic Digestion · Operational
1.711.4 km
Charlton Lane Eco Park (ACT)
Advanced Conversion Technologies · Under Construction
3.611.4 km
London�s Queen Elizabeth II reservoir
Solar Photovoltaics · Operational
6.311.6 km
Chertsey Water Treatment Works
Solar Photovoltaics · Operational
1.313.9 km

How big is Cobham Motorway Service Area - Solar Photovoltaics?

Cobham Motorway Service Area - Solar Photovoltaics has a recorded installed capacity of 0.45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cobham Motorway Service Area - Solar Photovoltaics?

REPD records the operator as Extra MSA Cobham Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cobham Motorway Service Area - Solar Photovoltaics approved and built?

The application was submitted on 2025-06-27. Permission was granted on 2025-08-25, 2 months later. The site became operational on 2025-10-01, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 19113.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council