Albury Landfill
Albury Landfill is operational in Guildford with a recorded capacity of 1.5 MW, and has been generating since 2012-12-19.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2012-12-19 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Landscape (AONB) — Surrey Hills
- Green Belt — Guildford
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Royal Surrey County Hospital - Solar Panels Solar Photovoltaics · Under Construction | — | 8.4 km |
Dorking Battery Energy Storage System Battery · Operational | 6 | 9.5 km |
Cobham Motorway Service Area - Solar Photovoltaics Solar Photovoltaics · Operational | 0.45 | 10.7 km |
Dunsfold Park Solar Farm Solar Photovoltaics · Operational | 2 | 12.3 km |
Capel Landfill Landfill Gas · Operational | 1 | 15 km |
How big is Albury Landfill?
Albury Landfill has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Albury Landfill?
REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Albury Landfill approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2012-12-19.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 767.