Renewable sites › Walton WTW PV
Walton WTW PV
Walton WTW PV is operational in Elmbridge with a recorded capacity of 1.8 MW, and has been generating since 2011-07-30.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2011-07-30 |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Elmbridge
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Elmbridge’s record on solar
Elmbridge has decided 8 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Elmbridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hurst Road - Walton Solar PV Farm Solar Photovoltaics · Operational | 0.55 | 0.2 km |
Charlton Lane Eco Park (Waste AD) Anaerobic Digestion · Operational | 1.7 | 3 km |
Charlton Lane Eco Park (ACT) Advanced Conversion Technologies · Under Construction | 3.6 | 3 km |
London�s Queen Elizabeth II reservoir Solar Photovoltaics · Operational | 6.3 | 6.3 km |
Kneller Hall School Solar Photovoltaics · Under Construction | 0.25 | 6.5 km |
Ham Close - 452 Houses, Flats & Leisure Centre Solar Photovoltaics · Under Construction | 0.43 | 6.9 km |
Heathrow Airport Biomass CHP Biomass (dedicated) · Operational | 1.8 | 7.5 km |
Mogden STW Sewage Sludge Digestion · Operational | 5.8 | 7.8 km |
How big is Walton WTW PV?
Walton WTW PV has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Walton WTW PV?
REPD records the operator as Thames Water Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Walton WTW PV approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2011-07-30.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2388.