Solar planning in Elmbridge

Elmbridge has decided 8 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 4 MW. 3 applications still awaiting a decision.

100%
Approved
8 granted · 0 refused
1.8 mo
Median decision
UK 2.3 mo
4 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How Elmbridge compares

Against the 298 UK authorities with 5+ solar decisions, Elmbridge sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.

Decisions by year

35Approved — 1 (2022)122Approved — 2 (2023)223Approved — 1 (2024)124Approved — 3 (2025)325
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (11)

SchemeMWStatusDecided
David Lloyd Leisure, Brooklands Road - Solar Photovoltaics Panels
David Lloyd Leisure Limited · 2025/1901 · 1.8 mo to decide
Awaiting Construction2025-09-18
Cobham Motorway Service Area - Solar Photovoltaics
Extra MSA Cobham Limited · 2025/1608 · 1.9 mo to decide
0.45Operational2025-08-25
Big Yellow Self Storage, Central Avenue - Solar Panels
Big Yellow Self Storage · 2025/1223 · 1.8 mo to decide
0.2Awaiting Construction2025-07-01
Avro Way, Brooklands Industrial Park - Solar Panel
Vodafone Limited · 2024/0180 · 1.8 mo to decide
0.18Awaiting Construction2024-03-21
Garson Farm, Winterdown Road - Solar Panels & Battery Storage
Thompson Brothers Esher Limited · 2023/0385
0.78Application Submitted2023-05-02
Vickers Drive North, Brooklands Industrial Park - Solar Panels
Prologis UK · 2023/0487 · 1.8 mo to decide
0.23Awaiting Construction2023-04-13
Avro Way, Brooklands Industrial Park - Solar Panel
Vodafone Limited · 2022/3759 · 1.8 mo to decide
0.23Revised2023-02-07
Hurst Road - Walton Solar PV Farm
Affinity Water Limited
0.55Operational2023-01-04
Garson Farm, Winterdown Road - Solar Panels
Thompson Brothers Esher Limited · 2022/1974 · 1.8 mo to decide
0.28Awaiting Construction2022-08-22
Avro Way - Solar Array
Vodafone Limited · 2021/2632
0.2Revised2021-10-18
Walton WTW PV
Thames Water Utilities
1.8Operational

Does Elmbridge approve solar farms?

Yes — of the 8 solar farms Elmbridge has decided, 100% were approved (8 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Elmbridge?

The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Elmbridge consented?

4 MW has been consented across 8 approved schemes. A further 3 applications awaits a decision.

Other technologies in Elmbridge

Battery storage in ElmbridgeOnshore wind in Elmbridge

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.