Renewable sitesLondon�s Queen Elizabeth II reservoir

London�s Queen Elizabeth II reservoir

London�s Queen Elizabeth II reservoir is operational in Kingston upon Thames with a recorded capacity of 6.3 MW, and has been generating since 2016-03-23.

6.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-23
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Kingston upon Thames
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-03-23

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Ham Close - 452 Houses, Flats & Leisure Centre
Solar Photovoltaics · Under Construction
0.435.5 km
Hurst Road - Walton Solar PV Farm
Solar Photovoltaics · Operational
0.556.3 km
Walton WTW PV
Solar Photovoltaics · Operational
1.86.3 km
Kneller Hall School
Solar Photovoltaics · Under Construction
0.257.8 km
Mogden STW
Sewage Sludge Digestion · Operational
5.88.6 km
Charlton Lane Eco Park (ACT)
Advanced Conversion Technologies · Under Construction
3.69.3 km
Charlton Lane Eco Park (Waste AD)
Anaerobic Digestion · Operational
1.79.3 km
Beddington EfW
EfW Incineration · Operational
2611.3 km

How big is London�s Queen Elizabeth II reservoir?

London�s Queen Elizabeth II reservoir has a recorded installed capacity of 6.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates London�s Queen Elizabeth II reservoir?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was London�s Queen Elizabeth II reservoir approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-03-23.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6063.