Renewable sites › London�s Queen Elizabeth II reservoir
London�s Queen Elizabeth II reservoir
London�s Queen Elizabeth II reservoir is operational in Kingston upon Thames with a recorded capacity of 6.3 MW, and has been generating since 2016-03-23.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-03-23 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ham Close - 452 Houses, Flats & Leisure Centre Solar Photovoltaics · Under Construction | 0.43 | 5.5 km |
Hurst Road - Walton Solar PV Farm Solar Photovoltaics · Operational | 0.55 | 6.3 km |
Walton WTW PV Solar Photovoltaics · Operational | 1.8 | 6.3 km |
Kneller Hall School Solar Photovoltaics · Under Construction | 0.25 | 7.8 km |
Mogden STW Sewage Sludge Digestion · Operational | 5.8 | 8.6 km |
Charlton Lane Eco Park (ACT) Advanced Conversion Technologies · Under Construction | 3.6 | 9.3 km |
Charlton Lane Eco Park (Waste AD) Anaerobic Digestion · Operational | 1.7 | 9.3 km |
Beddington EfW EfW Incineration · Operational | 26 | 11.3 km |
How big is London�s Queen Elizabeth II reservoir?
London�s Queen Elizabeth II reservoir has a recorded installed capacity of 6.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates London�s Queen Elizabeth II reservoir?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was London�s Queen Elizabeth II reservoir approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-03-23.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6063.