Renewable sitesHurst Road - Walton Solar PV Farm

Hurst Road - Walton Solar PV Farm

Hurst Road - Walton Solar PV Farm is an operational 0.55 MW solar farm in Elmbridge, generating since 1 April 2022. Planning permission was granted on 4 January 2023. Operator of record: Affinity Water Limited.

0.55 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2022
Solar Photovoltaics
Technology
Affinity Water Limited
Elmbridge
Authority
England

Planning and build timeline

Application submittednot recorded
Permission granted4 January 2023
Operational1 April 2022

Screening a site of your own?

RedlineUK · £39

Elmbridge approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hurst Road - Walton Solar PV Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Elmbridge’s record on solar

Elmbridge has decided 8 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Elmbridge

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.80.2 km
Anaerobic Digestion · Operational
1.73 km
Advanced Conversion Technologies · Under Construction
3.63 km
Solar Photovoltaics · Operational
6.36.3 km
Solar Photovoltaics · Under Construction
0.256.8 km
Solar Photovoltaics · Under Construction
0.437 km
Biomass (dedicated) · Operational
1.87.7 km
Sewage Sludge Digestion · Operational
5.88 km

How big is Hurst Road - Walton Solar PV Farm?

Hurst Road - Walton Solar PV Farm has a recorded installed capacity of 0.55 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hurst Road - Walton Solar PV Farm?

REPD records the operator as Affinity Water Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hurst Road - Walton Solar PV Farm approved and built?

REPD does not record a submission date. Permission was granted on 4 January 2023. The site became operational on 1 April 2022.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9951.