Novarly ParcelRenewable sites

Renewable sitesCharlton Lane Eco Park (Waste AD)

Charlton Lane Eco Park (Waste AD)

Charlton Lane Eco Park (Waste AD) is an operational 1.7 MW anaerobic digestion plant in Spelthorne, generating since 1 March 2018. Planning permission was granted on 29 June 2011, 7 months after submission. Operator of record: Surrey County Council.

1.7 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2018
Anaerobic Digestion
Technology
Surrey County Council
Spelthorne
Authority
England

Planning and build timeline

Application submitted25 November 2010
Permission granted29 June 2011
7 months after submission
Operational1 March 2018
80 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Spelthorne: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Charlton Lane Eco Park (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Advanced Conversion Technologies · Under Construction
3.60 km
Solar Photovoltaics · Operational
0.553 km
Solar Photovoltaics · Operational
1.83 km
Landfill Gas · Operational
45.2 km
Landfill Gas · Operational
2.76.2 km
Biomass (dedicated) · Operational
1.86.2 km
Solar Photovoltaics · Operational
1.37.2 km
Solar Photovoltaics · Under Construction
0.258.4 km

How big is Charlton Lane Eco Park (Waste AD)?

Charlton Lane Eco Park (Waste AD) has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Charlton Lane Eco Park (Waste AD)?

REPD records the operator as Surrey County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Charlton Lane Eco Park (Waste AD) approved and built?

The application was submitted on 25 November 2010. Permission was granted on 29 June 2011, 7 months later. The site became operational on 1 March 2018, 80 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 365.

Novarly Parcel · official public data, read properly · parcel.novarly.com