Chertsey Water Treatment Works

Chertsey Water Treatment Works is operational in Runnymede with a recorded capacity of 1.3 MW, and has been generating since 2022-04-01.

1.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-04-01
Solar Photovoltaics
Technology
Affinity Water Limited
Runnymede
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2022-04-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Trumps Farm Landfill Scheme
Landfill Gas · Operational
2.92.4 km
Norlands Lane Landfill Site
Landfill Gas · Operational
2.72.5 km
Trumps Farm (AD)
Anaerobic Digestion · Operational
2.42.5 km
Norlands Lane Landfill Site (Extension)
Landfill Gas · Operational
42.7 km
Wraysbury Landfill
Solar Photovoltaics · Operational
4.85.9 km
Charlton Lane Eco Park (Waste AD)
Anaerobic Digestion · Operational
1.77.2 km
Charlton Lane Eco Park (ACT)
Advanced Conversion Technologies · Under Construction
3.67.2 km
Heathrow Airport Biomass CHP
Biomass (dedicated) · Operational
1.89.2 km

How big is Chertsey Water Treatment Works?

Chertsey Water Treatment Works has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chertsey Water Treatment Works?

REPD records the operator as Affinity Water Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chertsey Water Treatment Works approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2022-04-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13104.