Renewable sites › Dorking Battery Energy Storage System
Dorking Battery Energy Storage System
Dorking Battery Energy Storage System is operational in Mole Valley with a recorded capacity of 6 MW, and has been generating since 2020-07-31.
Planning and build timeline
| Application submitted | 2016-07-20 |
| Permission granted | not recorded |
| Operational | 2020-07-31 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Landscape (AONB) — Surrey Hills
- Green Belt — Mole Valley
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cobham Motorway Service Area - Solar Photovoltaics Solar Photovoltaics · Operational | 0.45 | 9 km |
Albury Landfill Landfill Gas · Operational | 1.5 | 9.5 km |
Capel Landfill Landfill Gas · Operational | 1 | 10.4 km |
Brookhurst Wood (Waste AD) Anaerobic Digestion · Operational | 4.5 | 14.3 km |
Brookhurst Wood Gas to Energy Landfill Gas · Operational | 5.1 | 14.4 km |
Patteson Court Landfill Site Landfill Gas · Operational | 1.8 | 14.4 km |
Redhill 2 Landfill Gas · Operational | 3 | 14.6 km |
How big is Dorking Battery Energy Storage System?
Dorking Battery Energy Storage System has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Dorking Battery Energy Storage System?
REPD records the operator as Grid Battery Storage (GBSL). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Dorking Battery Energy Storage System approved and built?
The application was submitted on 2016-07-20. REPD does not record a grant date. The site became operational on 2020-07-31.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6909.