Renewable sites › Charlton Lane Eco Park (ACT)
Charlton Lane Eco Park (ACT)
Charlton Lane Eco Park (ACT) is a 3.6 MW advanced conversion plant under construction in Spelthorne. Planning permission was granted on 29 June 2011, 7 months after submission. Operator of record: SITA UK.
Planning and build timeline
| Application submitted | 25 November 2010 |
| Permission granted | 29 June 2011 7 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Spelthorne: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Charlton Lane Eco Park (ACT)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- Green Belt — Spelthorne
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.7 | 0 km |
Solar Photovoltaics · Operational | 0.55 | 3 km |
Solar Photovoltaics · Operational | 1.8 | 3 km |
Landfill Gas · Operational | 4 | 5.2 km |
Landfill Gas · Operational | 2.7 | 6.2 km |
Biomass (dedicated) · Operational | 1.8 | 6.2 km |
Solar Photovoltaics · Operational | 1.3 | 7.2 km |
Solar Photovoltaics · Under Construction | 0.25 | 8.4 km |
How big is Charlton Lane Eco Park (ACT)?
Charlton Lane Eco Park (ACT) has a recorded installed capacity of 3.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Charlton Lane Eco Park (ACT)?
REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Charlton Lane Eco Park (ACT) approved and built?
The application was submitted on 25 November 2010. Permission was granted on 29 June 2011, 7 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 999.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode