Renewable sitesHolly Street - Solar PV Panels

Holly Street - Solar PV Panels

Holly Street - Solar PV Panels is an operational 0.16 MW solar farm in Hackney, generating since 31 December 2021. Planning permission was granted on 21 February 2023, 18 months after submission. Operator of record: London Borough of Hackney.

0.16 MW
Capacity
as recorded in REPD
Operational
Status
since 31 December 2021
Solar Photovoltaics
Technology
London Borough of Hackney
Hackney
Authority
England

Planning and build timeline

Application submitted25 August 2021
Permission granted21 February 2023
18 months after submission
Operational31 December 2021

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Hackney: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Holly Street - Solar PV Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
34.6 km
Solar Photovoltaics · Operational
15 km
EfW Incineration · Operational
356.7 km
Solar Photovoltaics · Under Construction
7.7 km
Solar Photovoltaics · Operational
0.188 km
Solar Photovoltaics · Under Construction
0.248.4 km
EfW Incineration · Operational
558.5 km
Solar Photovoltaics · Operational
18.8 km

How big is Holly Street - Solar PV Panels?

Holly Street - Solar PV Panels has a recorded installed capacity of 0.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Holly Street - Solar PV Panels?

REPD records the operator as London Borough of Hackney. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Holly Street - Solar PV Panels approved and built?

The application was submitted on 25 August 2021. Permission was granted on 21 February 2023, 18 months later. The site became operational on 31 December 2021.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9632.