Renewable sites › Holly Street - Solar PV Panels
Holly Street - Solar PV Panels
Holly Street - Solar PV Panels is an operational 0.16 MW solar farm in Hackney, generating since 31 December 2021. Planning permission was granted on 21 February 2023, 18 months after submission. Operator of record: London Borough of Hackney.
Planning and build timeline
| Application submitted | 25 August 2021 |
| Permission granted | 21 February 2023 18 months after submission |
| Operational | 31 December 2021 |
Screening a site of your own?
Redline runs the record on your own boundary in Hackney: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Holly Street - Solar PV Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Biomass (dedicated) · Operational | 3 | 4.6 km |
Solar Photovoltaics · Operational | 1 | 5 km |
EfW Incineration · Operational | 35 | 6.7 km |
Solar Photovoltaics · Under Construction | — | 7.7 km |
Solar Photovoltaics · Operational | 0.18 | 8 km |
Solar Photovoltaics · Under Construction | 0.24 | 8.4 km |
EfW Incineration · Operational | 55 | 8.5 km |
Solar Photovoltaics · Operational | 1 | 8.8 km |
How big is Holly Street - Solar PV Panels?
Holly Street - Solar PV Panels has a recorded installed capacity of 0.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Holly Street - Solar PV Panels?
REPD records the operator as London Borough of Hackney. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Holly Street - Solar PV Panels approved and built?
The application was submitted on 25 August 2021. Permission was granted on 21 February 2023, 18 months later. The site became operational on 31 December 2021.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9632.