SELCHP ERF

SELCHP ERF is operational in Lewisham with a recorded capacity of 35 MW, and has been generating since 1993-12-01.

35 MW
Capacity
as recorded in REPD
Operational
Status
since 1993-12-01
EfW Incineration
Technology
Veolia (SELCHP)
Lewisham
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1993-12-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bywaters� Materials Recovery Facility Solar Array
Solar Photovoltaics · Operational
15 km
Thameside DC
Solar Photovoltaics · Operational
15.1 km
Dolphin Square - Solar panels
Solar Photovoltaics · Under Construction
6.3 km
King's Yard
Biomass (dedicated) · Operational
36.3 km
Leyes Road - New SEN School
Solar Photovoltaics · Under Construction
0.246.5 km
Holly Street - Solar PV Panels
Solar Photovoltaics · Operational
0.166.7 km
Beckton STW Enhanced Sludge Digestion
Sewage Sludge Digestion · Operational
5.89.8 km
Beckton Sewage Treatment Works
Wind Onshore · Operational
2.29.8 km

How big is SELCHP ERF?

SELCHP ERF has a recorded installed capacity of 35 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates SELCHP ERF?

REPD records the operator as Veolia (SELCHP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was SELCHP ERF approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1993-12-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4928.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council