Renewable sites › Advanced Manufacturing Research Centre
Advanced Manufacturing Research Centre
Advanced Manufacturing Research Centre is operational in Rotherham with a recorded capacity of 2.6 MW, and has been generating since 2009-01-20.
Planning and build timeline
| Application submitted | 2007-01-01 |
| Permission granted | 2007-06-01 5 months after submission |
| Operational | 2009-01-20 20 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Blackburn Meadows Battery · Operational | 10 | 3.9 km |
Blackburn Meadows Biomass Plant Biomass (dedicated) · Operational | 30 | 3.9 km |
Templeborough Biomass Power Plant- Rotherham Biomass (dedicated) · Operational | 42 | 3.9 km |
Sheffield ERF EfW Incineration · Operational | 19.3 | 4.7 km |
Meadow Hall Power Landfill Gas · Operational | 1.1 | 4.7 km |
Penny Hill Lane Wind Onshore · Operational | 19.8 | 5.4 km |
Parkwood Landfill Scheme Landfill Gas · Operational | 1.2 | 7 km |
Holbrook Community Renewable Energy Centre Biomass (dedicated) · Operational | 6.5 | 7 km |
How big is Advanced Manufacturing Research Centre?
Advanced Manufacturing Research Centre has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Advanced Manufacturing Research Centre?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Advanced Manufacturing Research Centre approved and built?
The application was submitted on 2007-01-01. Permission was granted on 2007-06-01, 5 months later. The site became operational on 2009-01-20, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3028.