Advanced Manufacturing Research Centre is operational in Rotherham with a recorded capacity of 2.6 MW, and has been generating since 2009-01-20.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-01-20
Wind Onshore
Technology
Unknown
Rotherham
Authority
England

Planning and build timeline

Application submitted2007-01-01
Permission granted2007-06-01
5 months after submission
Operational2009-01-20
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Blackburn Meadows
Battery · Operational
103.9 km
Blackburn Meadows Biomass Plant
Biomass (dedicated) · Operational
303.9 km
Templeborough Biomass Power Plant- Rotherham
Biomass (dedicated) · Operational
423.9 km
Sheffield ERF
EfW Incineration · Operational
19.34.7 km
Meadow Hall Power
Landfill Gas · Operational
1.14.7 km
Penny Hill Lane
Wind Onshore · Operational
19.85.4 km
Parkwood Landfill Scheme
Landfill Gas · Operational
1.27 km
Holbrook Community Renewable Energy Centre
Biomass (dedicated) · Operational
6.57 km

How big is Advanced Manufacturing Research Centre?

Advanced Manufacturing Research Centre has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Advanced Manufacturing Research Centre?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Advanced Manufacturing Research Centre approved and built?

The application was submitted on 2007-01-01. Permission was granted on 2007-06-01, 5 months later. The site became operational on 2009-01-20, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3028.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council