Advanced Manufacturing Research Centre
Advanced Manufacturing Research Centre is an operational 2.6 MW onshore wind farm in Rotherham, generating since 20 January 2009. Planning permission was granted on 1 June 2007, 5 months after submission. Operator of record: Unknown.
Planning and build timeline
| Application submitted | 1 January 2007 |
| Permission granted | 1 June 2007 5 months after submission |
| Operational | 20 January 2009 20 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Rotherham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Advanced Manufacturing Research Centre’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | 10 | 3.9 km |
Biomass (dedicated) · Operational | 30 | 3.9 km |
Biomass (dedicated) · Operational | 42 | 3.9 km |
EfW Incineration · Operational | 19.3 | 4.7 km |
Landfill Gas · Operational | 1.1 | 4.7 km |
Wind Onshore · Operational | 19.8 | 5.4 km |
Landfill Gas · Operational | 1.2 | 7 km |
Biomass (dedicated) · Operational | 6.5 | 7 km |
How big is Advanced Manufacturing Research Centre?
Advanced Manufacturing Research Centre has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Advanced Manufacturing Research Centre?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Advanced Manufacturing Research Centre approved and built?
The application was submitted on 1 January 2007. Permission was granted on 1 June 2007, 5 months later. The site became operational on 20 January 2009, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3028.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode