Renewable sites › Sheffield ERF
Sheffield ERF
Sheffield ERF is an operational 19.3 MW energy-from-waste plant in Sheffield, generating since 31 March 1999. Planning permission was granted on 7 March 1996, 2 months after submission. Operator of record: Veolia.
Planning and build timeline
| Application submitted | 16 January 1996 |
| Permission granted | 7 March 1996 2 months after submission |
| Operational | 31 March 1999 37 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Sheffield: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Sheffield ERF’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.2 | 2.8 km |
Wind Onshore · Operational | 2.6 | 4.7 km |
Battery · Operational | 10 | 5 km |
Biomass (dedicated) · Operational | 30 | 5 km |
Landfill Gas · Operational | 1.1 | 5.2 km |
Biomass (dedicated) · Operational | 42 | 6.4 km |
Biomass (dedicated) · Operational | 8 | 6.4 km |
Biomass (dedicated) · Operational | 6.5 | 9.9 km |
How big is Sheffield ERF?
Sheffield ERF has a recorded installed capacity of 19.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Sheffield ERF?
REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sheffield ERF approved and built?
The application was submitted on 16 January 1996. Permission was granted on 7 March 1996, 2 months later. The site became operational on 31 March 1999, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 903.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode