Renewable sites › Parkwood Landfill Scheme
Parkwood Landfill Scheme
Parkwood Landfill Scheme is an operational 1.2 MW landfill gas site in Sheffield, generating since 1 November 2004. Planning permission was granted on 7 January 1997, 7 months after submission. Operator of record: Coal Products Ltd Energy.
Planning and build timeline
| Application submitted | 30 May 1996 |
| Permission granted | 7 January 1997 7 months after submission |
| Operational | 1 November 2004 94 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Sheffield: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Parkwood Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Operational | 19.3 | 2.8 km |
Biomass (dedicated) · Operational | 8 | 4.8 km |
Landfill Gas · Operational | 1.1 | 5.4 km |
Biomass (dedicated) · Operational | 30 | 5.7 km |
Battery · Operational | 10 | 5.7 km |
Wind Onshore · Operational | 2.6 | 7 km |
Biomass (dedicated) · Operational | 42 | 7.4 km |
Wind Onshore · Operational | 19.8 | 12.3 km |
How big is Parkwood Landfill Scheme?
Parkwood Landfill Scheme has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Parkwood Landfill Scheme?
REPD records the operator as Coal Products Ltd Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Parkwood Landfill Scheme approved and built?
The application was submitted on 30 May 1996. Permission was granted on 7 January 1997, 7 months later. The site became operational on 1 November 2004, 94 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 616.