Novarly ParcelRenewable sites

Renewable sitesBewick Drift

Bewick Drift

Bewick Drift is an operational 2.3 MW onshore wind farm in Northumberland, generating since 31 March 2013. Planning permission was granted on 1 February 2008, 16 months after submission. Operator of record: Harworth Power.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2013
Wind Onshore
Technology
Harworth Power
Northumberland
Authority
England

Planning and build timeline

Application submitted15 October 2006
Permission granted1 February 2008
16 months after submission
Operational31 March 2013
62 months after consent

Screening a site of your own?

RedlineUK · £39

Northumberland approves 52% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bewick Drift’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Northumberland’s record on onshore wind

Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
4201.8 km
Wind Onshore · Operational
261.9 km
Wind Onshore · Operational
8.25.5 km
Anaerobic Digestion · Operational
0.55.6 km
Wind Onshore · Operational
18.457 km
Solar Photovoltaics · Operational
2.39.3 km
Wind Onshore · Operational
3.410.3 km
Battery · Operational
0.410.5 km

How big is Bewick Drift?

Bewick Drift has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bewick Drift?

REPD records the operator as Harworth Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bewick Drift approved and built?

The application was submitted on 15 October 2006. Permission was granted on 1 February 2008, 16 months later. The site became operational on 31 March 2013, 62 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3947.

Novarly Parcel · official public data, read properly · parcel.novarly.com