Bewick Drift is operational in Northumberland with a recorded capacity of 2.3 MW, and has been generating since 2013-03-31.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-31
Wind Onshore
Technology
Harworth Power
Northumberland
Authority
England

Planning and build timeline

Application submitted2006-10-15
Permission granted2008-02-01
16 months after submission
Operational2013-03-31
62 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Northumberland’s record on onshore wind

Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland

Other built sites within 15 km

SiteMWDistance
Lynemouth Power Station
Biomass (dedicated) · Operational
4201.8 km
Lynemouth Windfarm (Resubmission)
Wind Onshore · Operational
261.9 km
Sisters
Wind Onshore · Operational
8.25.5 km
North East Grains Site
Anaerobic Digestion · Operational
0.55.6 km
North Steads Wind Farm
Wind Onshore · Operational
18.457 km
Blyth Sewage Treatment Works
Solar Photovoltaics · Operational
2.39.3 km
Blyth Harbour Wind Farm (re-power)
Wind Onshore · Operational
3.410.3 km
County Hall, Loansdean - Battery Storage
Battery · Operational
0.410.5 km

How big is Bewick Drift?

Bewick Drift has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bewick Drift?

REPD records the operator as Harworth Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bewick Drift approved and built?

The application was submitted on 2006-10-15. Permission was granted on 2008-02-01, 16 months later. The site became operational on 2013-03-31, 62 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3947.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council