North Steads Wind Farm
North Steads Wind Farm is an operational 18.45 MW onshore wind farm in Northumberland, generating since 4 July 2016. Planning permission was granted on 6 November 2012, 9 months after submission. Operator of record: Ventient (formerly Infinis).
Planning and build timeline
| Application submitted | 30 January 2012 |
| Permission granted | 6 November 2012 9 months after submission |
| Operational | 4 July 2016 44 months after consent |
Screening a site of your own?
Northumberland approves 52% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with North Steads Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Northumberland’s record on onshore wind
Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 8.2 | 1.7 km |
Wind Onshore · Operational | 2.3 | 7 km |
Anaerobic Digestion · Operational | 0.5 | 8.2 km |
Biomass (dedicated) · Operational | 420 | 8.8 km |
Wind Onshore · Operational | 26 | 8.9 km |
Wind Onshore · Operational | 15 | 11 km |
Battery · Operational | 0.4 | 13 km |
Solar Photovoltaics · Operational | 0.8 | 13 km |
How big is North Steads Wind Farm?
North Steads Wind Farm has a recorded installed capacity of 18.45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates North Steads Wind Farm?
REPD records the operator as Ventient (formerly Infinis). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was North Steads Wind Farm approved and built?
The application was submitted on 30 January 2012. Permission was granted on 6 November 2012, 9 months later. The site became operational on 4 July 2016, 44 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3905.