North Steads Wind Farm
North Steads Wind Farm is operational in Northumberland with a recorded capacity of 18.45 MW, and has been generating since 2016-07-04.
Planning and build timeline
| Application submitted | 2012-01-30 |
| Permission granted | 2012-11-06 9 months after submission |
| Operational | 2016-07-04 44 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Northumberland’s record on onshore wind
Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Sisters Wind Onshore · Operational | 8.2 | 1.7 km |
Bewick Drift Wind Onshore · Operational | 2.3 | 7 km |
North East Grains Site Anaerobic Digestion · Operational | 0.5 | 8.2 km |
Lynemouth Power Station Biomass (dedicated) · Operational | 420 | 8.8 km |
Lynemouth Windfarm (Resubmission) Wind Onshore · Operational | 26 | 8.9 km |
Wingates Wind Farm Wind Onshore · Operational | 15 | 11 km |
County Hall, Loansdean - Solar Array Solar Photovoltaics · Operational | 0.8 | 13 km |
County Hall, Loansdean - Battery Storage Battery · Operational | 0.4 | 13 km |
How big is North Steads Wind Farm?
North Steads Wind Farm has a recorded installed capacity of 18.45 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates North Steads Wind Farm?
REPD records the operator as Ventient (formerly Infinis). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was North Steads Wind Farm approved and built?
The application was submitted on 2012-01-30. Permission was granted on 2012-11-06, 9 months later. The site became operational on 2016-07-04, 44 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3905.