Renewable sites › Lynemouth Power Station
Lynemouth Power Station
Lynemouth Power Station is an operational 420 MW biomass plant in Northumberland, generating since 21 November 2018. Planning permission was granted on 6 March 2015, 2 months after submission. Operator of record: Lynemouth Power.
Planning and build timeline
| Application submitted | 12 January 2015 |
| Permission granted | 6 March 2015 2 months after submission |
| Operational | 21 November 2018 45 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Northumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Lynemouth Power Station’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 26 | 0.7 km |
Wind Onshore · Operational | 2.3 | 1.8 km |
Anaerobic Digestion · Operational | 0.5 | 6.7 km |
Wind Onshore · Operational | 8.2 | 7.3 km |
Solar Photovoltaics · Operational | 2.3 | 8.2 km |
Wind Onshore · Operational | 18.45 | 8.8 km |
Wind Onshore · Operational | 3.4 | 8.9 km |
Wind Onshore · Operational | 2.7 | 9.4 km |
How big is Lynemouth Power Station?
Lynemouth Power Station has a recorded installed capacity of 420 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lynemouth Power Station?
REPD records the operator as Lynemouth Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lynemouth Power Station approved and built?
The application was submitted on 12 January 2015. Permission was granted on 6 March 2015, 2 months later. The site became operational on 21 November 2018, 45 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 115.
Novarly Parcel · official public data, read properly · parcel.novarly.com