Lynemouth Power Station

Lynemouth Power Station is operational in Northumberland with a recorded capacity of 420 MW, and has been generating since 2018-11-21.

420 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-11-21
Biomass (dedicated)
Technology
Lynemouth Power
Northumberland
Authority
England

Planning and build timeline

Application submitted2015-01-12
Permission granted2015-03-06
2 months after submission
Operational2018-11-21
45 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Lynemouth Windfarm (Resubmission)
Wind Onshore · Operational
260.7 km
Bewick Drift
Wind Onshore · Operational
2.31.8 km
North East Grains Site
Anaerobic Digestion · Operational
0.56.7 km
Sisters
Wind Onshore · Operational
8.27.3 km
Blyth Sewage Treatment Works
Solar Photovoltaics · Operational
2.38.2 km
North Steads Wind Farm
Wind Onshore · Operational
18.458.8 km
Blyth Harbour Wind Farm (re-power)
Wind Onshore · Operational
3.48.9 km
Blyth Harbour Wind Farm
Wind Onshore · Operational
2.79.4 km

How big is Lynemouth Power Station?

Lynemouth Power Station has a recorded installed capacity of 420 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lynemouth Power Station?

REPD records the operator as Lynemouth Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lynemouth Power Station approved and built?

The application was submitted on 2015-01-12. Permission was granted on 2015-03-06, 2 months later. The site became operational on 2018-11-21, 45 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 115.