Sisters

Sisters is operational in Northumberland with a recorded capacity of 8.2 MW, and has been generating since 2016-07-30.

8.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-07-30
Wind Onshore
Technology
Infinis (formerly Novera Energy)
Northumberland
Authority
England

Planning and build timeline

Application submitted2011-09-28
Permission granted2013-02-06
16 months after submission
Operational2016-07-30
42 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Northumberland’s record on onshore wind

Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland

Other built sites within 15 km

SiteMWDistance
North Steads Wind Farm
Wind Onshore · Operational
18.451.7 km
Bewick Drift
Wind Onshore · Operational
2.35.5 km
North East Grains Site
Anaerobic Digestion · Operational
0.56.6 km
Lynemouth Power Station
Biomass (dedicated) · Operational
4207.3 km
Lynemouth Windfarm (Resubmission)
Wind Onshore · Operational
267.3 km
County Hall, Loansdean - Solar Array
Solar Photovoltaics · Operational
0.811.5 km
County Hall, Loansdean - Battery Storage
Battery · Operational
0.411.5 km
Wingates Wind Farm
Wind Onshore · Operational
1511.7 km

How big is Sisters?

Sisters has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sisters?

REPD records the operator as Infinis (formerly Novera Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sisters approved and built?

The application was submitted on 2011-09-28. Permission was granted on 2013-02-06, 16 months later. The site became operational on 2016-07-30, 42 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4167.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council