North East Grains Site is an operational 0.5 MW anaerobic digestion plant in Northumberland, generating since 9 October 2021. Planning permission was granted on 5 February 2021, 23 months after submission. Operator of record: North East Grains.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 9 October 2021
Anaerobic Digestion
Technology
North East Grains
Northumberland
Authority
England

Planning and build timeline

Application submitted25 February 2019
Permission granted5 February 2021
23 months after submission
Operational9 October 2021
8 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Northumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with North East Grains Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.85.3 km
Battery · Operational
0.45.3 km
Wind Onshore · Operational
2.35.6 km
Wind Onshore · Operational
266.1 km
Wind Onshore · Operational
8.26.6 km
Biomass (dedicated) · Operational
4206.7 km
Wind Onshore · Operational
18.458.2 km
Solar Photovoltaics · Operational
2.38.9 km

How big is North East Grains Site?

North East Grains Site has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North East Grains Site?

REPD records the operator as North East Grains. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North East Grains Site approved and built?

The application was submitted on 25 February 2019. Permission was granted on 5 February 2021, 23 months later. The site became operational on 9 October 2021, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7245.