Renewable sites › County Hall, Loansdean - Battery Storage
County Hall, Loansdean - Battery Storage
County Hall, Loansdean - Battery Storage is operational in Northumberland with a recorded capacity of 0.4 MW, and has been generating since 2023-08-18.
Planning and build timeline
| Application submitted | 2022-12-12 |
| Permission granted | not recorded |
| Operational | 2023-08-18 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Northumberland’s record on battery storage
Northumberland has decided 12 battery storage schemes and approved 100%, taking a median of 7.3 months. See every battery storage scheme decision in Northumberland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
County Hall, Loansdean - Solar Array Solar Photovoltaics · Operational | 0.8 | 0 km |
North East Grains Site Anaerobic Digestion · Operational | 0.5 | 5.3 km |
MSD Cramlington Wind Onshore · Operational | 4 | 6.8 km |
Cramlington CHP Biomass (dedicated) · Operational | 27.7 | 7.4 km |
Brenkley Landfill Landfill Gas · Operational | 1.9 | 9.4 km |
Blyth Sewage Treatment Works Solar Photovoltaics · Operational | 2.3 | 9.4 km |
Bewick Drift Wind Onshore · Operational | 2.3 | 10.5 km |
Lynemouth Windfarm (Resubmission) Wind Onshore · Operational | 26 | 10.6 km |
How big is County Hall, Loansdean - Battery Storage?
County Hall, Loansdean - Battery Storage has a recorded installed capacity of 0.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates County Hall, Loansdean - Battery Storage?
REPD records the operator as Northumberland County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was County Hall, Loansdean - Battery Storage approved and built?
The application was submitted on 2022-12-12. REPD does not record a grant date. The site became operational on 2023-08-18.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12935.
Novarly Parcel · official public data, read properly · parcel.novarly.com