Renewable sitesBlyth Harbour Wind Farm (re-power)

Blyth Harbour Wind Farm (re-power)

Blyth Harbour Wind Farm (re-power) is operational in Northumberland with a recorded capacity of 3.4 MW, and has been generating since 2012-09-01.

3.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-09-01
Wind Onshore
Technology
Hainsford Energy
Northumberland
Authority
England

Planning and build timeline

Application submitted2007-07-06
Permission granted2008-07-21
13 months after submission
Operational2012-09-01
49 months after consent

Northumberland’s record on onshore wind

Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland

Other built sites within 15 km

SiteMWDistance
Blyth Harbour Wind Farm
Wind Onshore · Operational
2.70.5 km
Blyth Sewage Treatment Works
Solar Photovoltaics · Operational
2.32.6 km
Seghill Village Waste Disposal Site phase 1 and 2
Landfill Gas · Operational
4.17.8 km
MSD Cramlington
Wind Onshore · Operational
48.3 km
Lynemouth Windfarm (Resubmission)
Wind Onshore · Operational
268.5 km
Cramlington CHP
Biomass (dedicated) · Operational
27.78.5 km
Lynemouth Power Station
Biomass (dedicated) · Operational
4208.9 km
Blyth Offshore�Wind Test Site
Wind Offshore · Operational
41.59.6 km

How big is Blyth Harbour Wind Farm (re-power)?

Blyth Harbour Wind Farm (re-power) has a recorded installed capacity of 3.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blyth Harbour Wind Farm (re-power)?

REPD records the operator as Hainsford Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blyth Harbour Wind Farm (re-power) approved and built?

The application was submitted on 2007-07-06. Permission was granted on 2008-07-21, 13 months later. The site became operational on 2012-09-01, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4663.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council