Renewable sites › Yonderton Farm
Yonderton Farm
Yonderton Farm is an operational 1 MW onshore wind farm in Aberdeenshire, generating since 1 December 2014. Planning permission was granted on 23 July 2010, 2 months after submission. Operator of record: Green Cat Renewables.
Planning and build timeline
| Application submitted | 14 May 2010 |
| Permission granted | 23 July 2010 2 months after submission |
| Operational | 1 December 2014 52 months after consent |
Screening a site of your own?
Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Yonderton Farm’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on onshore wind
Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 4.3 | 5.2 km |
Solar Photovoltaics · Under Construction | 14.2 | 6.3 km |
Battery · Under Construction | — | 6.3 km |
Wind Onshore · Operational | 2.4 | 7.6 km |
Wind Onshore · Operational | 2.4 | 8.7 km |
Anaerobic Digestion · Under Construction | 3.5 | 9.3 km |
Battery · Operational | 1 | 12.2 km |
Wind Onshore · Operational | 6.9 | 13.6 km |
How big is Yonderton Farm?
Yonderton Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Yonderton Farm?
REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Yonderton Farm approved and built?
The application was submitted on 14 May 2010. Permission was granted on 23 July 2010, 2 months later. The site became operational on 1 December 2014, 52 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3723.