Renewable sites › Hillhead Of Gask, Longhaven - Solar Array
Hillhead Of Gask, Longhaven - Solar Array
Hillhead Of Gask, Longhaven - Solar Array is under construction in Aberdeenshire with a recorded capacity of 14.2 MW.
Planning and build timeline
| Application submitted | 2022-01-14 |
| Permission granted | 2022-04-08 3 months after submission |
| Operational | not recorded |
Aberdeenshire’s record on solar
Aberdeenshire has decided 39 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hillhead Of Gask, Longhaven -Battery Storage Battery · Under Construction | — | 0 km |
Stoneyhill Landfill Site Landfill Gas · Operational | 4.3 | 1.1 km |
Hywind 2 Battery · Operational | 1 | 6.2 km |
Yonderton Farm Wind Onshore · Operational | 1 | 6.3 km |
Bruxiehall Farm Solar Photovoltaics · Under Construction | 2 | 9.7 km |
West Knock Wind Cluster Wind Onshore · Operational | 2.4 | 10.8 km |
St Fergus Renewable Energy Park Battery · Under Construction | — | 11.5 km |
St Fergus Renewable Energy Park Wind Onshore · Under Construction | 3 | 11.5 km |
How big is Hillhead Of Gask, Longhaven - Solar Array?
Hillhead Of Gask, Longhaven - Solar Array has a recorded installed capacity of 14.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hillhead Of Gask, Longhaven - Solar Array?
REPD records the operator as The Greenspan Agency. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hillhead Of Gask, Longhaven - Solar Array approved and built?
The application was submitted on 2022-01-14. Permission was granted on 2022-04-08, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10469.