Hillhead Of Gask, Longhaven - Solar Array
Hillhead Of Gask, Longhaven - Solar Array is a 14.2 MW solar farm under construction in Aberdeenshire. Planning permission was granted on 8 April 2022, 3 months after submission. Operator of record: The Greenspan Agency.
Planning and build timeline
| Application submitted | 14 January 2022 |
| Permission granted | 8 April 2022 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Aberdeenshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hillhead Of Gask, Longhaven - Solar Array’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on solar
Aberdeenshire has decided 39 solar farms and approved 100%, taking a median of 2.1 months. See every solar farm decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Under Construction | — | 0 km |
Landfill Gas · Operational | 4.3 | 1.1 km |
Battery · Operational | 1 | 6.2 km |
Wind Onshore · Operational | 1 | 6.3 km |
Solar Photovoltaics · Under Construction | 2 | 9.7 km |
Wind Onshore · Operational | 2.4 | 10.8 km |
Battery · Under Construction | — | 11.5 km |
Wind Onshore · Under Construction | 3 | 11.5 km |
How big is Hillhead Of Gask, Longhaven - Solar Array?
Hillhead Of Gask, Longhaven - Solar Array has a recorded installed capacity of 14.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hillhead Of Gask, Longhaven - Solar Array?
REPD records the operator as The Greenspan Agency. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hillhead Of Gask, Longhaven - Solar Array approved and built?
The application was submitted on 14 January 2022. Permission was granted on 8 April 2022, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10469.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode